Third day of steel erection
Looking due North into the shop. We will have two 14' high roll-up doors Looking due North into the shop. We will have two 14' high roll-up doors
View ArticleThird day of steel erection
The shop side from a different angle The shop side from a different angle
View ArticleInside a swept out shop looking north
The plywood on the wall is for the breaker panel. Eventually I will put up about 25 sheets around the inside walls The plywood on the wall is for the breaker panel. Eventually I will put up about 25...
View ArticleThe RV pad
The black canister sitting on the concrete is the sewage ejector assembly The black canister sitting on the concrete is the sewage ejector assembly
View ArticleSetting the power pole for the shop
We will have 200 amp service for the shop and RV pads We will have 200 amp service for the shop and RV pads
View ArticleSome siding installed
We installed siding first on the walls where the well company needed to make entrance holes for plumbing - we were trying to stay one step ahead of them We installed siding first on the walls where...
View Article